Assignar Pay Product Release – August 24, 2026
TL;DR
- Documents that finish the job — Excel, PowerPoint, LibreOffice, and image handling are more dependable, and one problem field or unreadable file is less likely to stop the whole output.
- Payroll rules you can copy — and pay you can trust — duplicate Schedule of Rates rules instead of rebuilding them, with cleaner minimum-engagement, break, rest-day, overtime, and public-holiday handling, plus a fix that stops penalty-day pay from being counted twice.
- Scheduler organised around where, when, and how — a clearer toolbar, order dates that stay visible, and crew-planning actions that are easier to reach.
- Crew changes that scale across the day — when a crew’s daily quantity changes, Assignar Pay can offer to expand the update so you are not repeating the same edit cell by cell.
- Job costing and integrations you can share with confidence — customisable job-costing columns, cost codes on docket rate lines, inventory codes on Xero import reports, and chart labels you can set automatically or yourself.
Context
This release reflects work from August 16 – August 23, 2026 — a week focused on smoother document and merge workflows, clearer reporting, faster rule management, more accurate payroll, a more dependable scheduling experience, and better job-costing visibility so site and office teams quote, schedule, capture, and bill with fewer surprises.
Themes from the week
- Documents & templates: More polished Excel, PowerPoint, LibreOffice, and image outputs. Templates are more resilient — one problematic field or unreadable file is less likely to interrupt the whole process. Document and merge tools also offer broader template support.
- Reporting & visualisation: Configure chart labels automatically from your data, or set them yourself so reports are easier to understand and share.
- Schedule of Rates & payroll rules: Duplicate existing SoR rules and items instead of rebuilding them from scratch. Payroll rule management is streamlined across minimum engagement, breaks, rest days, overtime, and public holidays.
- Payroll accuracy: Improved minimum-engagement handling across complex days, and a guard that prevents penalty-day pay lines from being counted twice.
- Scheduler & crews: Toolbar reorganised around where, when, and how; order dates stay visible; crew-planning actions are easier to reach. When a crew’s daily quantity changes, Assignar Pay can offer to expand the update across the day.
- Job costing: Customise job-costing columns and views, see cost codes directly on docket rate lines, and benefit from improved cost-code validation and threshold handling.
- Integrations: Xero import reporting now includes inventory codes.
- Security, reliability & guidance: Stronger sign-in protection and visitor access controls, improved authentication-challenge handling, and more consistent data validation. Scheduling guidance has been refreshed so teams can get the most from the latest workflows.
These weekly summaries are indexed for the Assignar Pay Support Agent so guidance stays aligned with what actually shipped.
What's new
Documents that stay polished when a file is imperfect
Create more professional outputs from the templates your office already uses — spreadsheets, decks, LibreOffice files, and images — without one bad field stopping the whole pack.
What it does:
- Improved Excel, PowerPoint, LibreOffice, and image handling — more dependable conversion and merge for the file types construction teams actually send
- More resilient templates — one problematic field or unreadable file is less likely to interrupt the whole process
- Broader template support in document and merge tools — more flexibility for invoices, packs, and client-facing paperwork
Where you'll find it: Documents and merge / template flows when generating or merging Excel, PowerPoint, LibreOffice, and image-based outputs.
Who benefits: Project admins assembling client packs, commercial teams producing branded paperwork, and anyone who has had a single unreadable file stall a whole export.
Chart labels you can set — or leave on autopilot
Reports are easier to read in the room and in the inbox when the axes say what they mean.
What it does:
- Automatic chart labels — axis titles pick up the field names you selected
- Optional custom labels — set the titles yourself when the automatic name is not how your team talks about the work
- Labels that travel with the chart — previews, saved chart tiles, and dashboards stay consistent
Where you'll find it: Reports when you Create chart from this sheet, and in the Chart Library builder. Leave the X-axis / Y-axis title blank to keep the automatic name.
Who benefits: Project managers sharing progress charts, finance and ops leads building dashboards, and anyone who has had to explain “what that axis actually is” in a meeting.
Faster Schedule of Rates and payroll rule management
Stop rebuilding near-copies of rules you already trust. Duplicate SoR items and streamline the payroll rules that construction awards actually use.
What it does:
- Duplicate existing Schedule of Rates rules and items — copy charge rules, items, allowances, fees, and minimum-engagement rules instead of starting from a blank card
- Streamlined payroll rule management across minimum engagement, breaks, rest days, overtime, and public holidays — less time hunting through settings when an EBA or site practice changes
Where you'll find it: Schedule of Rates (V2 charge-rules editor — Duplicate on items and rule rows) and Pay Rates rule groups for minimum engagement, breaks, rest days, overtime, and public holidays.
Who benefits: Commercial leads maintaining SoR libraries, payroll admins applying award and EBA rules, and estimators who need a near-copy of an existing item without rebuilding it.
More accurate payroll on complex and penalty days
Pay outcomes stay closer to the award when minimum engagement spans a messy day and weekend or public-holiday premiums are not booked twice.
What it does:
- Improved minimum-engagement handling across complex days — more reliable top-up behaviour when the day is not a simple start-to-finish shift
- Penalty-day pay lines no longer counted twice — weekend and public-holiday premiums stay as the extra on top of the base, so the paid total does not inflate
Where you'll find it: Payroll / Pay Rates calculated pay on timesheets that include minimum engagement, weekend penalty, or public-holiday loadings.
Who benefits: Payroll admins running award-heavy crews, finance exporting pay to Xero or other payroll systems, and site teams who should not have to chase over-payments after a public holiday.
A clearer scheduling experience — where, when, and how
The scheduler toolbar is organised around how planners actually think: where you are looking, when the work is, and how you want the board to read.
What it does:
- Toolbar reorganised around where, when, and how — axis, dates, and view controls are easier to find and less crowded
- Order dates stay visible — the order’s active range remains in view so you can jump to the start or end of the job
- Crew-planning actions easier to reach — the actions you use to staff a day are closer to the work, not buried in a crowded bar
Where you'll find it: Scheduler toolbar (axis tabs, date navigation, View menu) and order rows (visible Dates). See the updated Scheduling guides.
Who benefits: Ops leads and dispatchers staffing weekly boards, and planners who need date, view, and crew actions without hunting through a crowded toolbar.
Crew planning that can expand across the day
When a crew does not fit the day’s current quantity, you can expand the day in the same flow instead of leaving the dialog and editing cell by cell.
What it does:
- Offer to expand a daily quantity when it changes — Assignar Pay can propose spreading the update across the day
- Confirmed, not automatic — you decide whether to expand, so demand on the order only changes when you accept
- Less repetitive crew work — bulk quantity changes without rebuilding the day by hand
Where you'll find it: Scheduler when deploying a crew onto an order×day cell. If a role is already full, the deploy dialog can offer to expand that day’s quantity first.
Who benefits: Foremen and ops leads dropping a full crew onto a day that was staffed for a smaller gang, and planners making same-day quantity changes under time pressure.
Job costing you can shape — and cost codes where you price the work
See the columns your commercial review actually needs, and keep cost codes visible on the docket lines that drive the invoice.
What it does:
- Customise job-costing columns and views — choose which columns appear and in what order on the order details page (Bid View and Transactions), including the printed PDF
- Cost codes on docket rate lines — see the code next to the rate while you review or bill the docket
- Improved cost-code validation and threshold handling — fewer mismatched or noisy codes when you review job cost
Where you'll find it: Job Costing / order details column configurator (Bid View and Transactions), and Dockets rate lines for on-line cost codes.
Who benefits: Project managers reviewing job financials, billing teams coding dockets, and finance reconciling cost codes before the invoice leaves.
Smoother Xero reporting
Inventory codes now travel with the Xero import report so plant and SoR lines are easier to reconcile in the accounting system.
What it does:
- Inventory codes on Xero import reporting — plant and SoR lines that use a printed cost code now carry that code through to the import report
Where you'll find it: Xero Invoice Import report — refresh report data and confirm inventory codes on plant / SoR lines.
Who benefits: Finance and accounts teams posting invoices to Xero, and commercial leads whose plant rates are coded by printed cost code.
Security, reliability, and refreshed scheduling guidance
Behind-the-scenes updates keep sign-in and visitor access tighter, and the scheduling docs now match how the board actually works.
What it does:
- Stronger sign-in protection and visitor access controls — tighter handling of who can get in and what a visitor can see
- Improved authentication-challenge handling — fewer avoidable interruptions when a sign-in check is required
- More consistent data validation across the product
- Refreshed scheduling guides — easier to get the most from the latest toolbar, crew, and board workflows
Where you'll find it: Sign-in and visitor access apply across the product — no extra setup. Scheduling guidance: Scheduling, including the board, views, crews, and bulk changes.
Who benefits: Every team signing in during a busy week; admins managing visitor access; ops leads learning the rebuilt scheduler.
Why it matters for construction teams
- Fewer stalled client packs: Resilient Excel, PowerPoint, and LibreOffice merges mean one unreadable file is less likely to block the whole submission or invoice pack.
- Awards and timesheets that stay aligned: Duplicating SoR rules, cleaner minimum-engagement on complex days, and no double-counted penalty-day lines reduce the Monday-after-a-public-holiday cleanup.
- Crews staffed without the cell-by-cell grind: A toolbar organised around where / when / how, visible order dates, and an offer to expand a day’s quantity keep roster changes inside the deploy flow.
- Job cost you can defend in the meeting: Custom columns, cost codes on docket rate lines, and inventory codes on the Xero import report shorten the path from docket → invoice → accounting.
- Reports that explain themselves: Automatic or custom chart labels mean PMs and finance can share a dashboard without a sidebar of “what that axis means.”
Getting started
- Documents & merges: Open a document or merge template that uses Excel, PowerPoint, LibreOffice, or images. Generate or merge the output and confirm a single problem field does not stop the rest of the pack.
- Chart labels: Open Reports → create or edit a chart (Create chart from this sheet or Chart Library). Confirm automatic axis titles, then optionally set X-axis title / Y-axis title.
- SoR duplication: Open Schedule of Rates. On an item, allowance, fee, or minimum-engagement rule, use Duplicate and confirm the copy keeps scoping and linked roles.
- Payroll rules: In Pay Rates, review minimum engagement, breaks, rest days, overtime, and public holiday rules on a timesheet that includes a complex or penalty day.
- Payroll accuracy: Process or preview a timesheet with weekend or public-holiday penalty plus a short shift that should top up for minimum engagement. Confirm the penalty is not added twice and the minimum-engagement top-up looks right.
- Scheduler toolbar: Open Scheduler. Use the axis tabs (Orders / Workers / Assets), date navigation, and View menu. Confirm order Dates stay visible on the row.
- Crew expand: Deploy a crew onto a day whose quantity is smaller than the crew. Confirm the dialog offers to expand the day’s quantity, and that declining leaves demand unchanged.
- Job costing columns: Open Job Costing on an order. Use the column configurator on Bid View and Transactions, then print or export the PDF and confirm the same columns and order.
- Docket cost codes: Open a docket and confirm cost codes appear on rate lines.
- Xero inventory codes: Open the Xero Invoice Import report, refresh data, and confirm inventory codes on SoR / plant lines.
- Scheduling guides: Read the updated Scheduling docs for the toolbar, views, crews, and bulk changes.
Permissions: Scheduling requires orders.view (see Setup & Access). Custom Reports require finance.reports. Document merge, Schedule of Rates, Job Costing, and Xero import reporting use the same access already required for those modules.
Try Assignar Pay: https://pay.assignar.com
Release details
Rollout: Updates in this note are rolling out on the standard Assignar Pay release cadence across accounts. Document and merge template improvements, chart axis labels, SoR rule duplication, payroll accuracy and rule-management updates, scheduler toolbar and crew-quantity expand, job-costing column configuration, docket cost-code visibility, Xero inventory-code reporting, and the security and validation updates listed here apply on the normal release path. Xero Invoice Import inventory codes apply where the Xero integration and that report are enabled for the tenant. Schedule of Rates duplication is available in the V2 charge-rules editor.
Changelog
Added:
- Duplicate action for Schedule of Rates V2 rules and items (items, allowances, fees, and minimum-engagement rules)
- Automatic and optional custom axis titles on charts (previews, chart tiles, and dashboards)
- Offer to expand a day’s quantity when deploying a crew that does not fit the current demand
- Job-costing column and view configurator on order details (Bid View and Transactions, including PDF)
- Inventory codes on the Xero Invoice Import report
Improved:
- Excel, PowerPoint, LibreOffice, and image handling in document and merge workflows
- Template resilience so one problem field or unreadable file is less likely to stop the whole process
- Broader template support in document and merge tools
- Payroll rule management across minimum engagement, breaks, rest days, overtime, and public holidays
- Minimum-engagement handling across complex days
- Scheduler toolbar organised around where, when, and how
- Order dates remain visible on the scheduler
- Crew-planning actions easier to reach
- Cost codes visible on docket rate lines
- Cost-code validation and threshold handling
- Sign-in protection and visitor access controls
- Authentication-challenge handling
- Consistency of data validation
- In-app scheduling documentation (board, views, crews, allocating, and related guides)
Fixed:
- Penalty-day pay lines no longer counted twice (weekend and public-holiday premiums)

