Scheduling

Plan orders on a timeline and allocate workers and assets to them — a forward planner that feeds directly into timesheets and payroll.

Scheduling

The Scheduling module is a forward planner for your orders: a timeline board where each row is an order and each column is a day, and you allocate workers and assets to the days each order needs them. Allocations flow directly into the worker loop — a scheduled worker sees their shift in My Shifts and files a timesheet against it, which then feeds payroll and invoicing.

How it fits together

  1. Orders define demand. When you build an order, its resource requirements (e.g. "2 Carpenters, Mon–Fri, 07:00–15:00") describe what the order needs each day across its date range.
  2. The scheduler fills demand. The board shows each order's demand day by day, and you allocate specific workers and assets against it — by drag and drop or click-to-add.
  3. Workers see their shifts. An allocated worker sees the shift in My Shifts (date, order, role, planned times) and files a timesheet against it, recording the activities and breaks they actually worked.
  4. Payroll prices the actuals. The timesheet — not the allocation — is what payroll and invoicing use. The schedule is the plan; the timesheet is the record.

Key concepts

ConceptWhat it is
OrderThe job being scheduled. Every order with days in the visible window appears on the board.
Resource requirementA demand line on the order: a role or asset, a quantity per day, working days, and times.
AllocationOne worker or one asset committed to one order on one day, with start and end times.
Role-less allocationA worker or asset allocated to an order's day without a specific requirement — useful when you just need someone on site.
Operator pairA worker and an asset allocated together — "this operator needs this asset with them."
SignalsNon-blocking warnings on allocations, such as a double-booking. The scheduler flags conflicts; it doesn't stop you — sometimes double-booking is intentional.

The forward-planning model

The scheduler deliberately treats time in three tiers:

  • The future is fully editable — that's what planning is.
  • Today is fully editable — sick calls, swaps, and extensions happen on the day, and the board must keep up.
  • The past is read-only. Days before today are visible for review but cannot be edited: no adding, no removing, no dragging into the past. Yesterday's schedule is a historical fact.

If something about a past day is wrong, the correction belongs on the timesheet — the record of what actually happened — not on the plan. Timesheets remain editable (with a full audit trail) until they're processed. See Forward-Only Planning for the reasoning and the practical workflows.